Bonnyton

BONNYTON FARM

SOLAR PHOTOVOLTAIC (PV)

Our live online event is live from 4pm – 7pm on Tuesday 22nd April. Use live chat at the bottom right of the screen.

WHO IS THE APPLICANT?

  • A wholly Scottish-owned company based in North Lanarkshire
    dedicated to clean energy generation and storage.
  • Based in Scotland.
  • Delivering over 2.5GW of generation projects for Scotland.
Rows of solar panels in a field under a cloudy sky.

WHY IS SOLAR PV IMPORTANT

  • Scotland is aiming to achieve net-zero by 2045.
  • Solar PV systems generate clean electricity directly from sunlight, providing a critical renewable energy source that reduces dependence on fossil fuels.
  • The Energy Strategy and Just Transition Plan 2024 promotes accelerated solar PV adoption across Scotland, supporting innovation and widespread deployment to diversify the renewable energy mix.
Advance Grid Solutions logo.

LOCATION

  • The development will connect to Castle Primary Substation via
    underground cable.
  • There is available grid capacity at this location.
  • There are very few suitable locations in Scotland such as this.
  • This location minimises the amount of connection infrastructure required which is better for the environment and means lower embodied carbon emissions.
  • The application site is located on land at Bonnyton, South of Kirkton Moor Road, G76 0PZ
  • The proposed site is approximately 57 hectares.
Site location map showing the Bonnyton solar site on an Ordnance Survey base.

SITE LAYOUT

  • Solar Photovoltaic (PV) (38780 x panels) with up to 27MW of capacity.
  • Circa 4.8- metre-long solar PV arrays at a height of approx. 2.8 metres.
  • An access track, electricity meter building, fences, solar PV arrays and related equipment would make up the development.
  • Solar PV arrays capture sunlight, converts it into clean green electricity and then exports it to the grid.
  • This reduces the grid’s demand for low-carbon green electricity.
  • The existing hedgerows and trees will be retained, and a belt of new planting and other native trees and plants is proposed to fully screen the development.
Infrastructure layout plan for the Bonnyton solar site.

SITE ELEVATIONS

  • Solar Photovoltaic (PV) (38780 x panels) with up to 27MW of energy storage.
  • Circa 4.8- metre-long solar PV arrays at a height of approx. 2.8 metres.
Elevation drawings of the proposed buildings viewed from each side.
Elevation drawing of the proposed solar panel mounting frames.

Download the
Presentation

PUBLIC CONSULTATION BOARD BONNYTON SOLAR.pdf

PAN Questionnaire

BONNYTON SOLAR

SOLAR PHOTOVOLTAIC (PV)







YesNo


YesNo