Rigifa Farm

RIGIFA FARM

BATTERY ENERGY STORAGE SYSTEM (BESS)

WHO IS THE APPLICANT?

  • UK Company dedicated to Energy Storage Development.
  • Based in the UK and Ireland.
  • Many years of experience in initiating and developing new renewable energy projects in the UK.
  • Delivering over 70MW of Energy Storage for Scotland.

Our Live online Event is live from 4pm – 7pm on Friday 19th May. Use live chat at bottom right of screen.

WHY IS BATTERY STORAGE IMPORTANT

  • Scotland is aiming to achieve net-zero by 2045.
  • Intermittent renewable energy generation means that we still have to rely on fossil fuel generation.
  • Battery Projects let us store excess renewables energy until it is needed – plugging the gap.
  • By 2050, according to National Grid ESO, we may require up to 40 GW of energy storage.
  • New energy storage capacity is encouraged by the Scottish Energy Strategy 2018 in order to hasten the adoption of storage innovation and deployment across Scotland.

LOCATION

  • The location is approximately 1.7km to the main Redmoss Grid Supply Point.
  • There is available grid capacity at this location.
  • There are very few suitable locations in Scotland such as this
  • This location minimises the amount of connection infrastructure required which is better for the environment and means lower embodied carbon emissions.
  • The application site is located on land at Rigifa Farm, adjacent to Cove Road, to the south of Cove and is screened to the south by Leith’s Quarry.

SITE ELEVATIONS

  • Containerised battery storage facility (56 x containers) with up to 49.9MW of energy storage.
  • Circa 7.8-meter-long containers at a height of approx. 2.6 meters.

SITE LAYOUT

 

  • Containerised battery storage facility (56 x containers) with up to 49.9MW of energy storage.
  • Circa 7.8-meter-long containers at a height of approx. 2.6 meters.
  • An access track, electricity meter building, fences, and containers housing batteries and related equipment would make up the development.
  • Stores extra grid generation in reserve – returns electricity to the grid as necessary. Allows more green energy to be added to grid mix.
  • This balances the grid’s supply and demand.
  • The existing hedgerows and trees will be retained and a belt of new planting of native trees is proposed along the roadside to screen the development.

Download the
Presentation

Rigifa-Boards.pdf

PAN Questionnaire

Rigifa Farm

PROPOSED BATTERY ENERGY STORAGE SYSTEM (BESS)







YesNo


YesNo